Municipality of Castel S. Pietro - Retrofit Vernora

Provision of new plates for existing switchboards, plant wiring. Rewriting of raw water purification sequences with existing devices and integration into existing automation.

Our role in the success of this project

  • Survey of existing wiring and electrical design of the new plates
  • Assembly and testing of the new plates and electromechanical components
  • Collaboration with the electrician, the municipality's technical office and the plant operator
  • Disposal of old plates, installation of new ones
  • On-site cabling - quickly and without interruption of the water supply
  • Relocation of the command and control station (ergonomics)
  • Survey of operating sequences and drafting of new software
  • Addition of a PLC periphery, integration into existing PLC and SCADA programmes
  • Function check with the operator, optimisation of sequences

Photogallery

Una creazione Redesign

Informativa Privacy

Utilizziamo i cookie perché il sito funzioni correttamente, per fornirti continuamente la migliore esperienza di navigazione possibile e per eseguire analisi sull’utilizzo del nostro sito web (statistiche). 

Abbiamo a cuore la tua privacy, i tuoi dati di navigazione o eventuali dati da te inseriti nelle nostre sezioni, non saranno mai condivisi con terze persone o partner.

Leggi la nostra informativa sul Trattamento dei dati .


Cliccando su “Accetto” confermi di aver letto e accettato la nostra informativa sul trattamento dei dati e consenti l'uso dei cookie durante la navigazione del sito.

Accetto